Guardian Warm Roofs

More Info
Before – Old polycarbonate roof
During – Old roof removed
New aluminium structure in place with 40mm insulation between the rafters with air gap between the insulation and the deck
Another 25mm of insulation with foamed and taped joints
The final layer of insulation – 60mm with 12mm plasterboard
Lights installed ready for plastering
After – The finished roof with new guttering and new lead flashing.